Early warning for construction contracts

Stop losing margin on contracts you've already won.

Kuper reads every email, site diary, RFI and drawing on your project against the contract, and tells your team what needs a notice, a variation or a reply while there's still time.

Margin, protected in both directions

Most of what gets lost on a project is lost on process, not on merits. Kuper does the reading, the clock-watching and the record-keeping that stretched contract teams can't keep up with.

Recover what you're owed

  • Notices inside the time barThe clock starts the day an event appears in the record, and a first-draft notice is ready to serve.
  • Variations captured before they're builtInstructions are checked against scope, and the site team hears "get it in writing" before work starts.
  • Paid in the next valuationEach event file is ready to value, so the work goes into the next monthly payment application.

Avoid what you'd otherwise owe

  • Engineer's notices answered on timeEvery notice to you is read against the contract, with its response period counting down.
  • Delay damages met with an extension of timeA programme revision that moves the critical path is flagged the day it lands.
  • Back-charges answered with the recordRejected work comes with the specification, the site records and a reply ready for review.
33.4%of project budgets in dispute, across 2,200+ projects in 114 countriesHKA, CRUX Insight 8th Annual Report
No. 1cause of construction disputes: failure to properly administer the contractArcadis, Global Construction Disputes Report

What Kuper catches

Six places contractors lose margin on a live project, and what Kuper does about each one.

A claim is time-barred because nobody saw the clock start.

What Kuper does

Every running clock sits in one register, with a first-draft notice citing the right clause, ready for your contract manager to serve while the entitlement is still alive.

NoticeNOT-031 ยท River crossing

Stay-cable stressing stood down: anchorage drawings late

Contract
Cl. 1.9 delayed drawings โ†’ Cl. 20.2 notice of claim
Clock
28 days from awareness on Day 3
23days left to notify
Draft notice ready for reviewReview draft

Extra work goes ahead on a verbal instruction and is never confirmed in writing.

What Kuper does

Instructions, RFIs and drawing revisions are checked against the scope baseline. Before anything is built, the site team hears: get it in writing.

Site channel ยท Segment 14Day 5
Traveller foreman ยท 07:42Engineer wants an extra cross-beam at segment 14 before the pour.
Kuper ยท 07:43This may be outside scope: ER ยง6.3 shows a standard segment. Get the instruction in writing before work starts.
VariationVAR-014 opened for the contract manager

The critical path moves, the Engineer's notices sit unanswered, and the exposure builds.

What Kuper does

Programme revisions and the Engineer's notices are read against the contract too, so the extension-of-time notice and the reply go out on time.

Open flags ยท River crossingDay 13
Delay

Deck closure now on the critical path

Cl. 8.5 extension of time ยท Cl. 8.8 delay damages

24 days left
Employer notice

Engineer rejects surface finish at Pier P3

Cl. 7.5 defects and rejection ยท Spec 1700, class F3

Reply needed

Variations sit as unbilled work in progress until the final account.

What Kuper does

Each event file is ready to value as the work happens, so it goes into the next interim payment application.

VariationVAR-014 ยท Ready to value

Extra cross-beam at deck segment 14

  • Day 5Site channel message from the traveller foreman
  • Day 6Written instruction requested
  • Day 7Engineer's instruction received
  • Days 8โ€“12Daywork records for the cross-beam
4 records linkedAdd to payment application

Substantiation is pieced together months later, after the people who were there have left.

What Kuper does

The event file builds as the work happens: clause, baseline, records and the decision taken. If it's disputed, the file already exists.

NoticeNOT-031 ยท Event file

Stay-cable stressing stood down: anchorage drawings late, RFI 212 open

  1. Day 0DWG-P-340 Rev D due; RFI 212 raised
  2. Day 3Site diary: stressing stood down
  3. Day 7Correspondence: RFI 212 still unanswered
  4. Day 8Confirmed by the contract manager; notice served with 23 days to spare
  5. Day 11RFI register updated
Clause, baseline, records and decision in one fileExport

One contract manager covers too many projects, and the tracker only works while they keep it up.

What Kuper does

Kuper reads every record on every project it runs on, so contract discipline doesn't depend on one person's spreadsheet.

Portfolio ยท open eventsExample
ProjectOpenNext deadline
River crossing3Notice ยท 23 days
Metro depot5Variation ยท before work starts
Port berth extension2Delay ยท 11 days
Ring road, package 20Nothing due

Who it's for

Contractors on construction and infrastructure projects, and the contract and claims consultants who work for them.

Contractors

Main contractors and subcontractors with live projects to run.

Contract managers
Every event flagged with the clause and the deadline, ready to confirm or dismiss.
QS and commercial managers
Substantiation built as the work happens, ready to value.
Commercial directors
Open events, exposure and ageing across every project.

Contract and claims consultants

Firms that run contract administration or claims for contractors on their projects.

Every contract you run
Read against its own conditions every day, whichever client it belongs to.
Every client
Notices, variations and delay events flagged in time to act, with the clause and records attached.
Every claim
Built on records captured as the work happened.

How it works

Set up once per project. From then on it reads every new record until final account, and nothing changes on site.

Configure

Your contract

Conditions, particular conditions, Employer's Requirements, specification and amendments become one rulebook, checked with your contracts team.

Connect

Your project record

Correspondence, site diaries, minutes, RFIs, instructions, drawing revisions and the programme, read where they already live.

Run

KUPER

Reads every new record against the rulebook and the weeks of records before it.

Every day

Flags for your contract manager

NoticeVariationDelayEmployer noticeScope check

Each with the clause, the records and the baseline attached, to confirm or dismiss.

Questions

What does Kuper read?

The project record as it already exists: correspondence, site diaries, minutes, RFIs, instructions, transmittals, drawing revisions and the programme, from project mail, your document platform and SharePoint.

Which contracts does it work with?

The major suites used across the Gulf and Europe, including FIDIC, NEC and JCT, along with bespoke and government forms and your own amendments.

Where does our data go?

It stays in your environment. Kuper connects to your mail, document platform and programme where they sit, and for firms that need it, Kuper runs in your own Azure tenant.

How much will my team need to review?

Only events with contractual significance. Routine correspondence is read and filed, and each flag arrives with the clause, the records and the baseline comparison attached, so it takes seconds to confirm or dismiss.

Who makes the call on a flag?

Your contract manager. Kuper sets out the evidence; they decide, and the decision is kept on file with the reason.

Partner with us

Put Kuper on one of your live projects and shape what it flags.